0.00% Raised
0.00 $ donated of 20,000.00 $ goal
0 Donors
Campaign has ended
  1. Construction of Asbob water project (construction of two concrete water tanks, installation of two electrical submersible pumps/ electrical horizontal pump, two pump units and generator rooms, installation of 22000 meter water network.
  2. Distribute 500 WFs, 500 BHKs
  3. Distribute 700WTs (750L)
  4. Conduct four cholera and solid waste campaigns
  5. Conduct three trainings for 30 community volunteers on 6 cholera and hygiene promotion key messages.